Site icon Smart Transport News

Tender Issued for Mall Road Depot of Agra Metro Corridor 2

Image Credit - Rangan Datta Wiki, CC BY-SA 4.0 , via Wikimedia Commons - Agra Metro Corridor 2

Representational Image

STN: The Uttar Pradesh Metro Rail Corporation Limited (UPMRCL) has issued a civil tender for the construction of a depot-cum-workshop at Mall Road. This facility will serve Agra Metro Corridor 2, which connects Agra Cantt to Kalindi Vihar.

The estimated cost of the contract is ₹177.58 crore. The selected contractor must complete the work within 18 months.

The depot will support train operations on Agra Metro Corridor 2. It will handle train stabling, inspection, and maintenance work.

Tender Details for Agra Metro Corridor 2

UPMRCL released the tender on 13 February 2026. The last date to submit bids is 16 March 2026.

Here are the key details:

UPMRCL will evaluate the bids as per its procurement guidelines.

Scope of Work Under Agra Metro Corridor 2 Depot Project

The contract covers civil, structural, and system works. The contractor will build a full depot-cum-workshop facility at Mall Road.

The scope includes:

Civil and Structural Works

Utility and System Installations

The depot will support train operations. It will provide space for train parking. It will also allow routine inspection and repair work.

This facility is important for safe and regular metro services.

Overview of Agra Metro Project

The Agra Metro project covers around 30 km under Phase 1. It includes two corridors:

Line 2 is also known as Agra Metro Corridor 2. The Mall Road depot will serve this line.

At present, a 5.2 km priority section of Line 1 is operational. It runs between Taj East Gate and Mankameshwar. This section connects major tourist areas, including the Taj Mahal.

The development of the depot will help speed up progress on Corridor 2. It will ensure trains operate smoothly once the corridor becomes operational.

Why the Mall Road Depot Matters

A metro system cannot run without a depot. The depot acts as the control and maintenance center. It supports daily operations.

The Mall Road depot will:

Once completed, Agra Metro Corridor 2 will improve daily travel. It will reduce traffic on major roads. It will also improve connectivity between Agra Cantt and Kalindi Vihar.

The project will help residents and visitors move across the city more easily.

FAQ – Agra Metro Corridor 2 Depot Project

Q1. What is the purpose of a metro depot?

A: A metro depot stores trains when they are not in service. It also handles maintenance, cleaning, and inspection work.

Q2. Where is the Mall Road depot located?

A: The depot will be built at Mall Road in Agra. It will support operations of Corridor 2.

Q3. How long will construction take?

A: UPMRCL has set the completion timeline at 18 months from the date of contract award.

Q4. Who can participate in the tender?

A: Eligible contractors with experience in civil, structural, and system works can submit bids as per tender conditions.

Q5. What is the length of Agra Metro Corridor 2?

A: Agra Metro Corridor 2 is 15.40 km long and includes 15 stations.

Q6. How will Corridor 2 benefit Agra?

A: It will improve public transport. It will reduce road congestion. It will offer faster travel between Agra Cantt and Kalindi Vihar.

Exit mobile version