UPMRCL Invites ₹492 Cr Civil Contract Bids for Lucknow Metro

Representational Image
0 119

STN: The Uttar Pradesh Metro Rail Corporation (UPMRCL) has invited bids for a major civil construction package under Phase-1B of Lucknow Metro. The tender focuses on building an elevated corridor along with stations and related infrastructure to expand metro services in the city.

This step marks steady progress in the next phase of Lucknow Metro, which aims to improve public transport access and reduce pressure on road traffic in busy areas of Lucknow.

Tender Details for Lucknow Metro Phase-1B

UPMRCL has shared detailed information related to the bidding process. The contract is valued at over ₹490 crore and covers design and construction responsibilities.

Tender Details – Lucknow Metro Phase-1B

ParameterDetails
Project AuthorityUttar Pradesh Metro Rail Corporation (UPMRCL)
Project NameLucknow Metro Phase-1B
Tender Opening Date1 January 2026
Tender Closing Date2 February 2026
Pre-Bid Meeting Date12 January 2026
Tender Security / EMD₹9.84 crore
Tender ID2025_UPMRC_261191_1
Tender NumberLKCC(02)-02
Approximate Project Cost₹492.22 crore
Completion Period30 months
Nature of WorkDesign and construction of elevated viaduct, stations, ramp, and associated works

The contract will be awarded to an eligible bidder that meets the technical and financial requirements set by UPMRCL.

Scope of Work Under Lucknow Metro Phase-1B

The selected contractor will carry out the design and construction of an elevated metro viaduct between Thakurganj Metro Station and Vasant Kunj Metro Station. The total elevated length is around 4.6 km, including station structures.

The scope of work includes:

  • Construction of an elevated viaduct
  • A 740-metre ramp connecting the viaduct to the depot entry and exit
  • Construction of five elevated metro stations:
    • Thakurganj
    • Balaganj
    • Sarfarajganj
    • Musabagh
    • Vasant Kunj
  • Civil and ancillary structures
  • PEB structures and architectural works
  • Water supply, drainage, and sanitary installations
  • External development and fire-fighting systems
  • Electrical and mechanical works

All works will follow standard safety norms and specifications defined for Lucknow Metro projects.

Phase-wise Corridor Details

At present, one corridor of Lucknow Metro is operational, while other sections are under construction. Phase-1B is a key expansion that will connect new areas to the existing network.

Phase-wise Corridor Details – Lucknow Metro

PhaseRouteElevated LengthUnderground LengthTotal LengthCurrent Status
Phase 1ACCS Airport – Munshi Pulia19.438 km3.440 km22.878 kmOperational
Phase 1BLucknow Railway Station – Vasant Kunj4.548 km6.550 km11.098 kmUnder Implementation
Total23.986 km9.990 km33.976 km

Once Phase-1B becomes operational, the total length of Lucknow Metro will reach nearly 34 km.

Why Phase-1B Is Important for Lucknow Metro

Phase-1B will improve metro connectivity between major transport hubs and residential areas. It will help daily commuters reduce travel time and dependence on private vehicles. The new stations will also support planned urban growth along the corridor.

UPMRCL plans to manage construction activities carefully to reduce disruption to road traffic during execution.

FAQs

Q1. Who can participate in the Lucknow Metro Phase-1B tender?

A: Contractors with experience in metro rail, elevated viaducts, or large infrastructure projects can apply, subject to UPMRCL eligibility criteria.

Q2. What is the estimated cost of the Phase-1B civil contract?

A: The approximate cost of the project is ₹492.22 crore.

Q3. How long will the construction take after the contract is awarded?

A: The completion period for the project is 30 months.

Q4. Will construction affect existing Lucknow Metro services?

A: No. Phase-1A operations will continue normally, as construction is planned on new alignments.

Q5. How will this phase benefit commuters?

A: Phase-1B will expand network coverage, improve access to metro stations, and offer a reliable travel option across more parts of the city.

Leave A Reply

Your email address will not be published.